Doing Business

Request for Statement of Interest

 

Washington Road District – Section 23-19129-00-BR – School Street Bridge

Tazewell County and Washington Road District are requesting Statements of Interest from interested firms for Phase I Preliminary Engineering and Phase II Preliminary Engineering to replace Structure 090-5027 on School Street over Farm Creek in the year 2027.  One firm will be selected to perform all Preliminary Engineering.

Statements of Interest must be received prior to 12:00 PM on May 30th, 2025 and shall be submitted via e-mail to dparr@tazewell-il.gov and paugspurger@tazewell-il.gov.    The Statement of Interest must not contain any cost information and shall include the required IDOT Form BDE Disc 2 Template “Consultant’s Disclosure Statement.”

Statements will be evaluated by the Selection Committee.  Applicants may be asked to provide additional information, presentations, or interviews.  Please see the Request for Statements of Interest at the link below.

Highway Entrance Permits

A written permit issued by the County Engineer is required for construction, modification, removal, or other work associated with an access driveway within County Highway right-of-way other than work performed by the Tazewell County Highway Department. All such permitted work shall be performed by the applicant at the applicant’s expense in accordance with the permit requirements as issued by the County Engineer. All resulting improvements within the County Highway right-of-way meeting the approval of the County Engineer shall become the property of the county by statute. Tazewell County Highway Department applies the Illinois Department of Transportation’s “Policy on Permits for Access Driveways to State Highways” in the discretion of the County Engineer. The location and intended use of the entrance is required information for the Office of County Engineer to determine what additional information may be necessary and what conditions and restrictions may need to be placed on the permit. A plan may be required in order to issue a permit. Interested parties are encouraged to call the Tazewell County Highway Department at 309-925-5532 as a first step.

A $15 fee is required for each highway entrance permit.

Utility Permits

A written permit issued by the County Engineer is required for ditches, drains, track, rails, poles, wires, pipe line, or other equipment to be placed anywhere within County Highway right-of-way by any public utility company, municipal corporation, or other public or private corporation, association, or person. The location of the proposed utility facilities, their alignment and/or offset relative to the highway right-of-way or centerline, and whether they are proposed to be buried or aerial are all necessary items of information for the Office of County Engineer to determine what additional information may be necessary and what conditions and restrictions may need to be placed on the permit. Interested parties are encouraged to call the Tazewell County Highway Department at 309-925-5532 as a first step.

Tazewell County Highway Department does not currently charge a fee for utility permits, however, the applicant may incur some expense for related costs. As an example, a title commitment from an acceptable title company is necessary in order for the County Engineer to issue a permit to place a sub-surface drain within county highway right-of-way.

A few sample utility permits are available by clicking below.

General Highway Permits

A written permit issued by the County Engineer is required for any work to occur within the County Highway right-of-way or in order to occupy any County Highway right-of-way. Interested parties are encouraged to call the Tazewell County Highway Department at 309-925-5532 as a first step.